Skip to main content

Box 100

 Container

Contains 17 Results:

811-074.000 Stahmann Farms, 1984-1986, undated

 File — Box: 100, Folder: 1-4
Scope and Contents From the Series: In the early 1980s, Wright Water worked for defendants Stahmann Farms and the State of New Mexico in relation to El Paso (Texas) v. Reynolds, No. 80-730 HB (often referred to in these files as El Paso v. New Mexico; Reynolds was the state engineer). Stahmann Farms operated the world's largest irrigated pecan orchard in southern New Mexico. At issue were potential depletions of the Rio Grande system, including the Hueco-Mesilla Bolson Aquifer, by El Paso's proposed groundwater pumping as well...
Dates: 1984-1986, undated

811-074 Exhibits for Leo Eisel deposition for Fall, 1986, Folder 2 of 2, 1977-1986

 File — Box: 100, Folder: 5
Scope and Contents From the Series: In the early 1980s, Wright Water worked for defendants Stahmann Farms and the State of New Mexico in relation to El Paso (Texas) v. Reynolds, No. 80-730 HB (often referred to in these files as El Paso v. New Mexico; Reynolds was the state engineer). Stahmann Farms operated the world's largest irrigated pecan orchard in southern New Mexico. At issue were potential depletions of the Rio Grande system, including the Hueco-Mesilla Bolson Aquifer, by El Paso's proposed groundwater pumping as well...
Dates: 1977-1986

811-074.000 Stahmann Farms, 1982-1985

 File — Box: 100, Folder: 6-10
Scope and Contents From the Series: In the early 1980s, Wright Water worked for defendants Stahmann Farms and the State of New Mexico in relation to El Paso (Texas) v. Reynolds, No. 80-730 HB (often referred to in these files as El Paso v. New Mexico; Reynolds was the state engineer). Stahmann Farms operated the world's largest irrigated pecan orchard in southern New Mexico. At issue were potential depletions of the Rio Grande system, including the Hueco-Mesilla Bolson Aquifer, by El Paso's proposed groundwater pumping as well...
Dates: 1982-1985

811-074 Pump Test Data and Documents (pumping tests), 1974-1980

 File — Box: 100, Folder: 11
Scope and Contents From the Series: In the early 1980s, Wright Water worked for defendants Stahmann Farms and the State of New Mexico in relation to El Paso (Texas) v. Reynolds, No. 80-730 HB (often referred to in these files as El Paso v. New Mexico; Reynolds was the state engineer). Stahmann Farms operated the world's largest irrigated pecan orchard in southern New Mexico. At issue were potential depletions of the Rio Grande system, including the Hueco-Mesilla Bolson Aquifer, by El Paso's proposed groundwater pumping as well...
Dates: 1974-1980

Stahmann, 1985, undated

 File — Box: 100, Folder: 12
Scope and Contents From the Series: In the early 1980s, Wright Water worked for defendants Stahmann Farms and the State of New Mexico in relation to El Paso (Texas) v. Reynolds, No. 80-730 HB (often referred to in these files as El Paso v. New Mexico; Reynolds was the state engineer). Stahmann Farms operated the world's largest irrigated pecan orchard in southern New Mexico. At issue were potential depletions of the Rio Grande system, including the Hueco-Mesilla Bolson Aquifer, by El Paso's proposed groundwater pumping as well...
Dates: 1985, undated

[Miscellany], 1983, undated

 File — Box: 100, Folder: 13
Scope and Contents From the Series: In the early 1980s, Wright Water worked for defendants Stahmann Farms and the State of New Mexico in relation to El Paso (Texas) v. Reynolds, No. 80-730 HB (often referred to in these files as El Paso v. New Mexico; Reynolds was the state engineer). Stahmann Farms operated the world's largest irrigated pecan orchard in southern New Mexico. At issue were potential depletions of the Rio Grande system, including the Hueco-Mesilla Bolson Aquifer, by El Paso's proposed groundwater pumping as well...
Dates: 1983, undated

Texas, Hueco Bolson, El Paso Water Utilities Public Service Board, 1985

 File — Box: 100, Folder: 14
Scope and Contents From the Series: In the early 1980s, Wright Water worked for defendants Stahmann Farms and the State of New Mexico in relation to El Paso (Texas) v. Reynolds, No. 80-730 HB (often referred to in these files as El Paso v. New Mexico; Reynolds was the state engineer). Stahmann Farms operated the world's largest irrigated pecan orchard in southern New Mexico. At issue were potential depletions of the Rio Grande system, including the Hueco-Mesilla Bolson Aquifer, by El Paso's proposed groundwater pumping as well...
Dates: 1985

811-074.000 Stahmann Farms, Bluelines, undated

 File — Box: 100, Folder: 15
Scope and Contents From the Series: In the early 1980s, Wright Water worked for defendants Stahmann Farms and the State of New Mexico in relation to El Paso (Texas) v. Reynolds, No. 80-730 HB (often referred to in these files as El Paso v. New Mexico; Reynolds was the state engineer). Stahmann Farms operated the world's largest irrigated pecan orchard in southern New Mexico. At issue were potential depletions of the Rio Grande system, including the Hueco-Mesilla Bolson Aquifer, by El Paso's proposed groundwater pumping as well...
Dates: undated

811-074.000 Stahmann Farms, Leo Eisel's Deposition, 1986, undated

 File — Box: 100, Folder: 16
Scope and Contents From the Series: In the early 1980s, Wright Water worked for defendants Stahmann Farms and the State of New Mexico in relation to El Paso (Texas) v. Reynolds, No. 80-730 HB (often referred to in these files as El Paso v. New Mexico; Reynolds was the state engineer). Stahmann Farms operated the world's largest irrigated pecan orchard in southern New Mexico. At issue were potential depletions of the Rio Grande system, including the Hueco-Mesilla Bolson Aquifer, by El Paso's proposed groundwater pumping as well...
Dates: 1986, undated

[Water quality data], 1986

 File — Box: 100, Folder: 17
Scope and Contents From the Series: In the early 1980s, Wright Water worked for defendants Stahmann Farms and the State of New Mexico in relation to El Paso (Texas) v. Reynolds, No. 80-730 HB (often referred to in these files as El Paso v. New Mexico; Reynolds was the state engineer). Stahmann Farms operated the world's largest irrigated pecan orchard in southern New Mexico. At issue were potential depletions of the Rio Grande system, including the Hueco-Mesilla Bolson Aquifer, by El Paso's proposed groundwater pumping as well...
Dates: 1986

Stahmann, 1984-1986, undated

 File — Box: 100, Folder: 18
Scope and Contents From the Series: In the early 1980s, Wright Water worked for defendants Stahmann Farms and the State of New Mexico in relation to El Paso (Texas) v. Reynolds, No. 80-730 HB (often referred to in these files as El Paso v. New Mexico; Reynolds was the state engineer). Stahmann Farms operated the world's largest irrigated pecan orchard in southern New Mexico. At issue were potential depletions of the Rio Grande system, including the Hueco-Mesilla Bolson Aquifer, by El Paso's proposed groundwater pumping as well...
Dates: 1984-1986, undated

Stahmann bibliographic index, undated

 File — Box: 100, Folder: 19
Scope and Contents From the Series: In the early 1980s, Wright Water worked for defendants Stahmann Farms and the State of New Mexico in relation to El Paso (Texas) v. Reynolds, No. 80-730 HB (often referred to in these files as El Paso v. New Mexico; Reynolds was the state engineer). Stahmann Farms operated the world's largest irrigated pecan orchard in southern New Mexico. At issue were potential depletions of the Rio Grande system, including the Hueco-Mesilla Bolson Aquifer, by El Paso's proposed groundwater pumping as well...
Dates: undated

Wright Water Engineers Documents for 1982 Court Hearing, undated

 File — Box: 100, Folder: 20
Scope and Contents From the Series: In the early 1980s, Wright Water worked for defendants Stahmann Farms and the State of New Mexico in relation to El Paso (Texas) v. Reynolds, No. 80-730 HB (often referred to in these files as El Paso v. New Mexico; Reynolds was the state engineer). Stahmann Farms operated the world's largest irrigated pecan orchard in southern New Mexico. At issue were potential depletions of the Rio Grande system, including the Hueco-Mesilla Bolson Aquifer, by El Paso's proposed groundwater pumping as well...
Dates: undated

Wilson, Lee and Associates, Water supply alternatives for El Paso (unpublished), 1981

 File — Box: 100, Folder: 21
Scope and Contents From the Series: In the early 1980s, Wright Water worked for defendants Stahmann Farms and the State of New Mexico in relation to El Paso (Texas) v. Reynolds, No. 80-730 HB (often referred to in these files as El Paso v. New Mexico; Reynolds was the state engineer). Stahmann Farms operated the world's largest irrigated pecan orchard in southern New Mexico. At issue were potential depletions of the Rio Grande system, including the Hueco-Mesilla Bolson Aquifer, by El Paso's proposed groundwater pumping as well...
Dates: 1981

Wombold, Lynn B., Projections of the Population of New Mexico by County, 1980-2005, June, 1985, 1985

 File — Box: 100, Folder: 22
Scope and Contents From the Series: In the early 1980s, Wright Water worked for defendants Stahmann Farms and the State of New Mexico in relation to El Paso (Texas) v. Reynolds, No. 80-730 HB (often referred to in these files as El Paso v. New Mexico; Reynolds was the state engineer). Stahmann Farms operated the world's largest irrigated pecan orchard in southern New Mexico. At issue were potential depletions of the Rio Grande system, including the Hueco-Mesilla Bolson Aquifer, by El Paso's proposed groundwater pumping as well...
Dates: 1985

Wright, Deposition of Kenneth R. Wright, 1981

 File — Box: 100, Folder: 23
Scope and Contents From the Series: In the early 1980s, Wright Water worked for defendants Stahmann Farms and the State of New Mexico in relation to El Paso (Texas) v. Reynolds, No. 80-730 HB (often referred to in these files as El Paso v. New Mexico; Reynolds was the state engineer). Stahmann Farms operated the world's largest irrigated pecan orchard in southern New Mexico. At issue were potential depletions of the Rio Grande system, including the Hueco-Mesilla Bolson Aquifer, by El Paso's proposed groundwater pumping as well...
Dates: 1981

Wilson, Lee. Questions for Deposition, undated

 File — Box: 100, Folder: 24
Scope and Contents From the Series: In the early 1980s, Wright Water worked for defendants Stahmann Farms and the State of New Mexico in relation to El Paso (Texas) v. Reynolds, No. 80-730 HB (often referred to in these files as El Paso v. New Mexico; Reynolds was the state engineer). Stahmann Farms operated the world's largest irrigated pecan orchard in southern New Mexico. At issue were potential depletions of the Rio Grande system, including the Hueco-Mesilla Bolson Aquifer, by El Paso's proposed groundwater pumping as well...
Dates: undated