Box 100
Container
Contains 17 Results:
811-074.000 Stahmann Farms, 1984-1986, undated
File — Box: 100, Folder: 1-4
Scope and Contents
From the Series:
In the early 1980s, Wright Water worked for defendants Stahmann Farms and the State of New Mexico in relation to El Paso (Texas) v. Reynolds, No. 80-730 HB (often referred to in these files as El Paso v. New Mexico; Reynolds was the state engineer). Stahmann Farms operated the world's largest irrigated pecan orchard in southern New Mexico. At issue were potential depletions of the Rio Grande system, including the Hueco-Mesilla Bolson Aquifer, by El Paso's proposed groundwater pumping as well...
Dates:
1984-1986, undated
811-074 Exhibits for Leo Eisel deposition for Fall, 1986, Folder 2 of 2, 1977-1986
File — Box: 100, Folder: 5
Scope and Contents
From the Series:
In the early 1980s, Wright Water worked for defendants Stahmann Farms and the State of New Mexico in relation to El Paso (Texas) v. Reynolds, No. 80-730 HB (often referred to in these files as El Paso v. New Mexico; Reynolds was the state engineer). Stahmann Farms operated the world's largest irrigated pecan orchard in southern New Mexico. At issue were potential depletions of the Rio Grande system, including the Hueco-Mesilla Bolson Aquifer, by El Paso's proposed groundwater pumping as well...
Dates:
1977-1986
811-074.000 Stahmann Farms, 1982-1985
File — Box: 100, Folder: 6-10
Scope and Contents
From the Series:
In the early 1980s, Wright Water worked for defendants Stahmann Farms and the State of New Mexico in relation to El Paso (Texas) v. Reynolds, No. 80-730 HB (often referred to in these files as El Paso v. New Mexico; Reynolds was the state engineer). Stahmann Farms operated the world's largest irrigated pecan orchard in southern New Mexico. At issue were potential depletions of the Rio Grande system, including the Hueco-Mesilla Bolson Aquifer, by El Paso's proposed groundwater pumping as well...
Dates:
1982-1985
811-074 Pump Test Data and Documents (pumping tests), 1974-1980
File — Box: 100, Folder: 11
Scope and Contents
From the Series:
In the early 1980s, Wright Water worked for defendants Stahmann Farms and the State of New Mexico in relation to El Paso (Texas) v. Reynolds, No. 80-730 HB (often referred to in these files as El Paso v. New Mexico; Reynolds was the state engineer). Stahmann Farms operated the world's largest irrigated pecan orchard in southern New Mexico. At issue were potential depletions of the Rio Grande system, including the Hueco-Mesilla Bolson Aquifer, by El Paso's proposed groundwater pumping as well...
Dates:
1974-1980
Stahmann, 1985, undated
File — Box: 100, Folder: 12
Scope and Contents
From the Series:
In the early 1980s, Wright Water worked for defendants Stahmann Farms and the State of New Mexico in relation to El Paso (Texas) v. Reynolds, No. 80-730 HB (often referred to in these files as El Paso v. New Mexico; Reynolds was the state engineer). Stahmann Farms operated the world's largest irrigated pecan orchard in southern New Mexico. At issue were potential depletions of the Rio Grande system, including the Hueco-Mesilla Bolson Aquifer, by El Paso's proposed groundwater pumping as well...
Dates:
1985, undated
[Miscellany], 1983, undated
File — Box: 100, Folder: 13
Scope and Contents
From the Series:
In the early 1980s, Wright Water worked for defendants Stahmann Farms and the State of New Mexico in relation to El Paso (Texas) v. Reynolds, No. 80-730 HB (often referred to in these files as El Paso v. New Mexico; Reynolds was the state engineer). Stahmann Farms operated the world's largest irrigated pecan orchard in southern New Mexico. At issue were potential depletions of the Rio Grande system, including the Hueco-Mesilla Bolson Aquifer, by El Paso's proposed groundwater pumping as well...
Dates:
1983, undated
Texas, Hueco Bolson, El Paso Water Utilities Public Service Board, 1985
File — Box: 100, Folder: 14
Scope and Contents
From the Series:
In the early 1980s, Wright Water worked for defendants Stahmann Farms and the State of New Mexico in relation to El Paso (Texas) v. Reynolds, No. 80-730 HB (often referred to in these files as El Paso v. New Mexico; Reynolds was the state engineer). Stahmann Farms operated the world's largest irrigated pecan orchard in southern New Mexico. At issue were potential depletions of the Rio Grande system, including the Hueco-Mesilla Bolson Aquifer, by El Paso's proposed groundwater pumping as well...
Dates:
1985
811-074.000 Stahmann Farms, Bluelines, undated
File — Box: 100, Folder: 15
Scope and Contents
From the Series:
In the early 1980s, Wright Water worked for defendants Stahmann Farms and the State of New Mexico in relation to El Paso (Texas) v. Reynolds, No. 80-730 HB (often referred to in these files as El Paso v. New Mexico; Reynolds was the state engineer). Stahmann Farms operated the world's largest irrigated pecan orchard in southern New Mexico. At issue were potential depletions of the Rio Grande system, including the Hueco-Mesilla Bolson Aquifer, by El Paso's proposed groundwater pumping as well...
Dates:
undated
811-074.000 Stahmann Farms, Leo Eisel's Deposition, 1986, undated
File — Box: 100, Folder: 16
Scope and Contents
From the Series:
In the early 1980s, Wright Water worked for defendants Stahmann Farms and the State of New Mexico in relation to El Paso (Texas) v. Reynolds, No. 80-730 HB (often referred to in these files as El Paso v. New Mexico; Reynolds was the state engineer). Stahmann Farms operated the world's largest irrigated pecan orchard in southern New Mexico. At issue were potential depletions of the Rio Grande system, including the Hueco-Mesilla Bolson Aquifer, by El Paso's proposed groundwater pumping as well...
Dates:
1986, undated
[Water quality data], 1986
File — Box: 100, Folder: 17
Scope and Contents
From the Series:
In the early 1980s, Wright Water worked for defendants Stahmann Farms and the State of New Mexico in relation to El Paso (Texas) v. Reynolds, No. 80-730 HB (often referred to in these files as El Paso v. New Mexico; Reynolds was the state engineer). Stahmann Farms operated the world's largest irrigated pecan orchard in southern New Mexico. At issue were potential depletions of the Rio Grande system, including the Hueco-Mesilla Bolson Aquifer, by El Paso's proposed groundwater pumping as well...
Dates:
1986
Stahmann, 1984-1986, undated
File — Box: 100, Folder: 18
Scope and Contents
From the Series:
In the early 1980s, Wright Water worked for defendants Stahmann Farms and the State of New Mexico in relation to El Paso (Texas) v. Reynolds, No. 80-730 HB (often referred to in these files as El Paso v. New Mexico; Reynolds was the state engineer). Stahmann Farms operated the world's largest irrigated pecan orchard in southern New Mexico. At issue were potential depletions of the Rio Grande system, including the Hueco-Mesilla Bolson Aquifer, by El Paso's proposed groundwater pumping as well...
Dates:
1984-1986, undated
Stahmann bibliographic index, undated
File — Box: 100, Folder: 19
Scope and Contents
From the Series:
In the early 1980s, Wright Water worked for defendants Stahmann Farms and the State of New Mexico in relation to El Paso (Texas) v. Reynolds, No. 80-730 HB (often referred to in these files as El Paso v. New Mexico; Reynolds was the state engineer). Stahmann Farms operated the world's largest irrigated pecan orchard in southern New Mexico. At issue were potential depletions of the Rio Grande system, including the Hueco-Mesilla Bolson Aquifer, by El Paso's proposed groundwater pumping as well...
Dates:
undated
Wright Water Engineers Documents for 1982 Court Hearing, undated
File — Box: 100, Folder: 20
Scope and Contents
From the Series:
In the early 1980s, Wright Water worked for defendants Stahmann Farms and the State of New Mexico in relation to El Paso (Texas) v. Reynolds, No. 80-730 HB (often referred to in these files as El Paso v. New Mexico; Reynolds was the state engineer). Stahmann Farms operated the world's largest irrigated pecan orchard in southern New Mexico. At issue were potential depletions of the Rio Grande system, including the Hueco-Mesilla Bolson Aquifer, by El Paso's proposed groundwater pumping as well...
Dates:
undated
Wilson, Lee and Associates, Water supply alternatives for El Paso (unpublished), 1981
File — Box: 100, Folder: 21
Scope and Contents
From the Series:
In the early 1980s, Wright Water worked for defendants Stahmann Farms and the State of New Mexico in relation to El Paso (Texas) v. Reynolds, No. 80-730 HB (often referred to in these files as El Paso v. New Mexico; Reynolds was the state engineer). Stahmann Farms operated the world's largest irrigated pecan orchard in southern New Mexico. At issue were potential depletions of the Rio Grande system, including the Hueco-Mesilla Bolson Aquifer, by El Paso's proposed groundwater pumping as well...
Dates:
1981
Wombold, Lynn B., Projections of the Population of New Mexico by County, 1980-2005, June, 1985, 1985
File — Box: 100, Folder: 22
Scope and Contents
From the Series:
In the early 1980s, Wright Water worked for defendants Stahmann Farms and the State of New Mexico in relation to El Paso (Texas) v. Reynolds, No. 80-730 HB (often referred to in these files as El Paso v. New Mexico; Reynolds was the state engineer). Stahmann Farms operated the world's largest irrigated pecan orchard in southern New Mexico. At issue were potential depletions of the Rio Grande system, including the Hueco-Mesilla Bolson Aquifer, by El Paso's proposed groundwater pumping as well...
Dates:
1985
Wright, Deposition of Kenneth R. Wright, 1981
File — Box: 100, Folder: 23
Scope and Contents
From the Series:
In the early 1980s, Wright Water worked for defendants Stahmann Farms and the State of New Mexico in relation to El Paso (Texas) v. Reynolds, No. 80-730 HB (often referred to in these files as El Paso v. New Mexico; Reynolds was the state engineer). Stahmann Farms operated the world's largest irrigated pecan orchard in southern New Mexico. At issue were potential depletions of the Rio Grande system, including the Hueco-Mesilla Bolson Aquifer, by El Paso's proposed groundwater pumping as well...
Dates:
1981
Wilson, Lee. Questions for Deposition, undated
File — Box: 100, Folder: 24
Scope and Contents
From the Series:
In the early 1980s, Wright Water worked for defendants Stahmann Farms and the State of New Mexico in relation to El Paso (Texas) v. Reynolds, No. 80-730 HB (often referred to in these files as El Paso v. New Mexico; Reynolds was the state engineer). Stahmann Farms operated the world's largest irrigated pecan orchard in southern New Mexico. At issue were potential depletions of the Rio Grande system, including the Hueco-Mesilla Bolson Aquifer, by El Paso's proposed groundwater pumping as well...
Dates:
undated