Skip to main content

Box 96

 Container

Contains 5 Results:

811-074.000 Stahmann Farms Inc. El Paso vs. New Mexico - Testimony Notebooks, 1981-1986, undated

 File — Box: 96, Folder: 1-3
Scope and Contents From the Series: In the early 1980s, Wright Water worked for defendants Stahmann Farms and the State of New Mexico in relation to El Paso (Texas) v. Reynolds, No. 80-730 HB (often referred to in these files as El Paso v. New Mexico; Reynolds was the state engineer). Stahmann Farms operated the world's largest irrigated pecan orchard in southern New Mexico. At issue were potential depletions of the Rio Grande system, including the Hueco-Mesilla Bolson Aquifer, by El Paso's proposed groundwater pumping as well...
Dates: 1981-1986, undated

[Notebook], 1985-1987, undated

 File — Box: 96, Folder: 4
Scope and Contents From the Series: In the early 1980s, Wright Water worked for defendants Stahmann Farms and the State of New Mexico in relation to El Paso (Texas) v. Reynolds, No. 80-730 HB (often referred to in these files as El Paso v. New Mexico; Reynolds was the state engineer). Stahmann Farms operated the world's largest irrigated pecan orchard in southern New Mexico. At issue were potential depletions of the Rio Grande system, including the Hueco-Mesilla Bolson Aquifer, by El Paso's proposed groundwater pumping as well...
Dates: 1985-1987, undated

811-074.080 New Mexico Public Entities Correspondence, 1987

 File — Box: 96, Folder: 5
Scope and Contents From the Series: In the early 1980s, Wright Water worked for defendants Stahmann Farms and the State of New Mexico in relation to El Paso (Texas) v. Reynolds, No. 80-730 HB (often referred to in these files as El Paso v. New Mexico; Reynolds was the state engineer). Stahmann Farms operated the world's largest irrigated pecan orchard in southern New Mexico. At issue were potential depletions of the Rio Grande system, including the Hueco-Mesilla Bolson Aquifer, by El Paso's proposed groundwater pumping as well...
Dates: 1987

811-074.080 Water Dept. Annual Reports for Other Cities, 1984-1987

 File — Box: 96, Folder: 6
Scope and Contents From the Series: In the early 1980s, Wright Water worked for defendants Stahmann Farms and the State of New Mexico in relation to El Paso (Texas) v. Reynolds, No. 80-730 HB (often referred to in these files as El Paso v. New Mexico; Reynolds was the state engineer). Stahmann Farms operated the world's largest irrigated pecan orchard in southern New Mexico. At issue were potential depletions of the Rio Grande system, including the Hueco-Mesilla Bolson Aquifer, by El Paso's proposed groundwater pumping as well...
Dates: 1984-1987

811-074.040 [Modelling files], 1985-1986, undated

 File — Box: 96, Folder: 7-11
Scope and Contents From the Series: In the early 1980s, Wright Water worked for defendants Stahmann Farms and the State of New Mexico in relation to El Paso (Texas) v. Reynolds, No. 80-730 HB (often referred to in these files as El Paso v. New Mexico; Reynolds was the state engineer). Stahmann Farms operated the world's largest irrigated pecan orchard in southern New Mexico. At issue were potential depletions of the Rio Grande system, including the Hueco-Mesilla Bolson Aquifer, by El Paso's proposed groundwater pumping as well...
Dates: 1985-1986, undated