Box 79
Container
Contains 1 Result:
742-68.4A USC Phase IV Contract Documents, 1980
File — Box: 79, Folder: 30
Identifier: Series 10
Scope and Contents
From the Series:
In 1974, Wright-McLaughlin Engineers was hired to create a master plan for surface and subsurface drainage at Southern Colorado State College's Belmont Campus in Pueblo. SCSC became the University of Southern Colorado in 1975 (and CSU Pueblo in 2003) and had several recently constructed buildings with more planned. Due to expansive soils, those buildings faced damage from groundwater and pipe leakage. The company's work continued with additional phases as reflected in this series. File...
Dates:
1980