Box 33
Container
Contains 13 Results:
Fraser River Basin. Phase I -- Feasibility Study. Summary Report, 1989 December
File — Box: 33, Folder: 1
Identifier: Subseries 1.8
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1989 December
Fraser River Basin. Phase I Feasibility Study. Final Report. [Prepared for] Colorado Water Resources and Power Development Authority [by] CH2M Hill, 1989 December
File — Box: 33, Folder: 2
Identifier: Subseries 1.8
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1989 December
Fraser River Basin. Phase I -- Feasibility Study. Technical Appendix, 1989 December
File — Box: 33, Folder: 3
Identifier: Subseries 1.8
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1989 December
Drafts of summary reports, 1988 January 6
File — Box: 33, Folder: 4
Identifier: Subseries 1.8
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1988 January 6
Draft Task 5 Report, 1988 March 14
File — Box: 33, Folder: 5
Identifier: Subseries 1.8
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1988 March 14
Draft Task Report 6.0 Storable Flows, 1988 May
File — Box: 33, Folder: 6
Identifier: Subseries 1.8
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1988 May
Draft Task Report 9.0 Reservoir Reconnaissance, 1988 July
File — Box: 33, Folder: 7
Identifier: Subseries 1.8
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1988 July
Chapter 10 Technical Memorandum Plan Elements, 1988 October
File — Box: 33, Folder: 8
Identifier: Subseries 1.8
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1988 October
Chapter 11 Plan Formulation and Evaluation, 1988 October
File — Box: 33, Folder: 9
Identifier: Subseries 1.8
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1988 October
Task Report 12.0 Recommended Plan, 1989 January
File — Box: 33, Folder: 10
Identifier: Subseries 1.8
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1989 January
Task Report 12.0 Recommended Plans (Amended), 1989 February
File — Box: 33, Folder: 11
Identifier: Subseries 1.8
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1989 February
Geotechnical Investigations Volume 1
File — Box: 33, Folder: 12
Identifier: Subseries 1.8
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1960-1991 and undated
Geotechnical Investigations Volume 2
File — Box: 33, Folder: 13
Identifier: Subseries 1.8
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1960-1991 and undated