Box 29
Container
Contains 12 Results:
Clear Creek Project. Phase I -- Feasibility Study. Summary Report, 1987 November
File — Box: 29, Folder: 1
Identifier: Subseries 1.7
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1987 November
Clear Creek Project. Phase I -- Feasibility Study. Final Report. Vol. 1. Prepared for Colorado Water Resources and Power Development Authority. Prepared by Tudor Engineering Company, 1987 November
File — Box: 29, Folder: 2
Identifier: Subseries 1.7
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1987 November
Clear Creek Project. Phase I -- Feasibility Study. Final Report -- Appendixes. Volume II, 1987 November
File — Box: 29, Folder: 3
Identifier: Subseries 1.7
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1987 November
Clear Creek Project. Phase I, Step 2 -- Feasibility Study. Summary Report, 1989 June
File — Box: 29, Folder: 4
Identifier: Subseries 1.7
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1989 June
Clear Creek Project. Phase I, Step 2 -- Feasibility Study. Final Report. Prepared for Colorado Water Resources and Power Development Authority. Prepared by Tudor Engineering Company, 1989 June
File — Box: 29, Folder: 5
Identifier: Subseries 1.7
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1989 June
Clear Creek Project. Phase I -- Feasibility Study. Plan of Study, 1986 July 14
File — Box: 29, Folder: 6
Identifier: Subseries 1.7
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1986 July 14
Clear Creek Project. Phase I, Step 2 -- Feasibility Study. Plan of Study, 1988 March
File — Box: 29, Folder: 7
Identifier: Subseries 1.7
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1988 March
Clear Creek Feasibility Study. Status Report. [Monthly reports], 1986-1989
File — Box: 29, Folder: 8
Identifier: Subseries 1.7
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1986-1989
Phase I, Step 2 -- Feasibility Study. Final Report -- Appendixes, 1989 June
File — Box: 29, Folder: 9
Identifier: Subseries 1.7
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1989 June
Phase I, Step 2 -- Feasibility Study. Final Report, 1989 June
File — Box: 29, Folder: 10
Identifier: Subseries 1.7
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1989 June
Phase I Feasibility Study. Summary Memorandum No. 1 [with three earlier drafts], 1986 December 4
File — Box: 29, Folder: 11
Identifier: Subseries 1.7
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1986 December 4
Phase I -- Feasibility Study. Final Report -- Appendixes. Volume II, 1987 November
File — Box: 29, Folder: 12
Identifier: Subseries 1.7
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1987 November