San Luis Valley Confined Aquifer Study. Phase I. Final Report. Loose draft, 1987 August
File — Box: 22, Folder: 1
Identifier: Subseries 1.5
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1987 August
San Luis Valley Confined Aquifer Study (phase I). Executive Summary. Final Report. Prepared for Colorado Water Resources and Power Development Authority [by] HRS Water Consultants, Inc. with Robert E. Moran, 1987 August
File — Box: 22, Folder: 2
Identifier: Subseries 1.5
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1987 August
San Luis Valley Confined Aquifer Study (phase I). Appendices. Final Report. Prepared for Colorado Water Resources and Power Development Authority [by] HRS Water Consultants, Inc. with Robert E. Moran, 1987 August
File — Box: 22, Folder: 3
Identifier: Subseries 1.5
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1987 August
Feasibility Study. Plan of Study for Phase IB, 1987 January 22
File — Box: 22, Folder: 4
Identifier: Subseries 1.5
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1987 January 22
Feasibility Study. Interim Task 1 Report with Appendices, 1986 August 19
File — Box: 22, Folder: 5
Identifier: Subseries 1.5
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1986 August 19
Feasibility Study. Task 2 (and Subtask 2-A), 1986
File — Box: 22, Folder: 6
Identifier: Subseries 1.5
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1986
Feasibility Study. Interim Task 2 Report / Appendixes, 1987 April
File — Box: 22, Folder: 7
Identifier: Subseries 1.5
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1987 April
Feasibility Study. Task 4, 1986 June 20
File — Box: 22, Folder: 8
Identifier: Subseries 1.5
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1986 June 20
Feasibility Study. Task 5, 1987 June
File — Box: 22, Folder: 9
Identifier: Subseries 1.5
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1987 June
Feasibility Study. Task 8 (Concluding Memorandum In-Situ), 1986
File — Box: 22, Folder: 10
Identifier: Subseries 1.5
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1986
Reports/Permits/Studies. "Impact of Increasing Streamflow in the Rio Grande River." Draft, 1984 December
File — Box: 22, Folder: 11
Identifier: Subseries 1.5
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1984 December
Reports/Permits/Studies. Water Rights Filing on the Baca Grant Ranch, 1986-1987
File — Box: 22, Folder: 12
Identifier: Subseries 1.5
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1986-1987
Reports/Permits/Studies. Preliminary Interpretation of Data from Well No. 1-19, 1986 December
File — Box: 22, Folder: 13
Identifier: Subseries 1.5
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1986 December