Skip to main content

Box 21

 Container

Contains 24 Results:

Draft Final Report. Joint-Use Reservoir and Green Mountain Exchange, 1987 April

 File — Box: 21, Folder: 21
Identifier: Subseries 1.4
Scope and Contents From the Series: From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates: 1987 April

Conveyance Facility. Design Notes, Drawings, Maps and Data, 1985-1986

 File — Box: 21, Folder: 22
Identifier: Subseries 1.4
Scope and Contents From the Series: From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates: 1985-1986

"The Environmental Caucus Recommendations to the Denver Board of Water Commissioners Regarding Future Water Supply Scenarios." Colorado Environmental Caucus, 1986 January 16

 File — Box: 21, Folder: 23
Identifier: Subseries 1.4
Scope and Contents From the Series: From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates: 1986 January 16

Joint-Use Reservoir and Green Mountain Exchange Projects. Presentation to Board of Directors. Colorado Water Resources and Power Development Authority, 1987 June 5

 File — Box: 21, Folder: 24
Identifier: Subseries 1.4
Scope and Contents From the Series: From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates: 1987 June 5