Box 14
Container
Contains 10 Results:
Joint-Use Reservoir and Green Mountain Exchange Projects. Summary Report, 1987 April
File — Box: 14, Folder: 1
Identifier: Subseries 1.4
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1987 April
Joint-Use Reservoir and Green Mountain Exchange Projects. Final Report. Prepared for Colorado Water Resources and Power Development Authority. Prepared by Boyle Engineering Corporation, 1987 April
File — Box: 14, Folder: 2
Identifier: Subseries 1.4
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1987 April
Joint-Use Reservoir and Green Mountain Exchange Projects. Technical Appendixes. Prepared for Colorado Water Resources and Power Development Authority. Prepared by Boyle Engineering Corporation, 1987 April
File — Box: 14, Folder: 3
Identifier: Subseries 1.4
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1987 April
Joint Use Project Feasibility Study. Task Memorandum 1
File — Box: 14, Folder: 4
Identifier: Subseries 1.4
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1960-1991 and undated
Task 2 Data Collection Memorandum, 1985 October 22
File — Box: 14, Folder: 5
Identifier: Subseries 1.4
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1985 October 22
Task 3 Screening Report, c. 1985
File — Box: 14, Folder: 6
Identifier: Subseries 1.4
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
c. 1985
Task 3. Initial Screening Report. Draft, 1986 January
File — Box: 14, Folder: 7
Identifier: Subseries 1.4
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1986 January
Task 3. Initial Screening Report. Draft with Addendum, 1986 March 11
File — Box: 14, Folder: 8
Identifier: Subseries 1.4
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1986 March 11
Task 3. Initial Screening Report. Draft Originals, 1986 January
File — Box: 14, Folder: 9
Identifier: Subseries 1.4
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1986 January
Memorandum. Preliminary Hydrologic Analysis. Draft, 1986 August
File — Box: 14, Folder: 10
Identifier: Subseries 1.4
Scope and Contents
From the Series:
From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates:
1986 August