Skip to main content

Box 14

 Container

Contains 10 Results:

Joint-Use Reservoir and Green Mountain Exchange Projects. Summary Report, 1987 April

 File — Box: 14, Folder: 1
Identifier: Subseries 1.4
Scope and Contents From the Series: From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates: 1987 April

Joint-Use Reservoir and Green Mountain Exchange Projects. Final Report. Prepared for Colorado Water Resources and Power Development Authority. Prepared by Boyle Engineering Corporation, 1987 April

 File — Box: 14, Folder: 2
Identifier: Subseries 1.4
Scope and Contents From the Series: From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates: 1987 April

Joint-Use Reservoir and Green Mountain Exchange Projects. Technical Appendixes. Prepared for Colorado Water Resources and Power Development Authority. Prepared by Boyle Engineering Corporation, 1987 April

 File — Box: 14, Folder: 3
Identifier: Subseries 1.4
Scope and Contents From the Series: From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates: 1987 April

Joint Use Project Feasibility Study. Task Memorandum 1

 File — Box: 14, Folder: 4
Identifier: Subseries 1.4
Scope and Contents From the Series: From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates: 1960-1991 and undated

Task 2 Data Collection Memorandum, 1985 October 22

 File — Box: 14, Folder: 5
Identifier: Subseries 1.4
Scope and Contents From the Series: From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates: 1985 October 22

Task 3 Screening Report, c. 1985

 File — Box: 14, Folder: 6
Identifier: Subseries 1.4
Scope and Contents From the Series: From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates: c. 1985

Task 3. Initial Screening Report. Draft, 1986 January

 File — Box: 14, Folder: 7
Identifier: Subseries 1.4
Scope and Contents From the Series: From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates: 1986 January

Task 3. Initial Screening Report. Draft with Addendum, 1986 March 11

 File — Box: 14, Folder: 8
Identifier: Subseries 1.4
Scope and Contents From the Series: From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates: 1986 March 11

Task 3. Initial Screening Report. Draft Originals, 1986 January

 File — Box: 14, Folder: 9
Identifier: Subseries 1.4
Scope and Contents From the Series: From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates: 1986 January

Memorandum. Preliminary Hydrologic Analysis. Draft, 1986 August

 File — Box: 14, Folder: 10
Identifier: Subseries 1.4
Scope and Contents From the Series: From 1983 to 1990, the Colorado Water Resources and Power Development Authority conducted, at the request of local sponsors, several feasibility studies to find potential projects for the Authority to finance. The engineering reports and basic data from the Authority-funded water planning studies constitute this series. The studies were conducted in the following river basins: Turkey Creek (San Juan River), Upper Gunnison River, Cache la Poudre River, St. Vrain River, Blue River, San Luis...
Dates: 1986 August