Box 4
Container
Contains 1 Result:
Whipple, John J. Red Bluff Project, Texas, water supply if historic stateline deliveries under the Pecos River Compact had been augmented based on a cumulative adjusted departure of -39,900 acre-feet for the period 1984 through 1986, an addendum to the 1950 through 1983 period study, errata. Santa Fe: New Mexico Interstate Stream Commission, October 1988, 1988
File — Box: 4, Folder: 6
Identifier: Subseries 2.3
Scope and Contents
From the Sub-Series:
This subseries consists primarily of copies of documents that served as background information on the case. The subseries is arranged alphabetically by author.
Dates:
1988